Phase 01
Concept & business case
What problem is being solved, and whether the system touches a GxP record at all. The determination made here sets the cost of everything after it, and a correct determination that something is out of scope is among the largest savings available across the lifecycle.
Phase 02
Requirements
The URS, written as requirements expressed from the user's perspective. Regulatory requirements stated alongside functional ones, rather than appended as a separate compliance annex.
Phase 03
Supplier selection
Assessment and, where warranted, audit. What qualification evidence you can inherit, what you cannot, and which clauses need to be in the contract — notification of change, data ownership, exit and retrieval — while you still have leverage.
Phase 04
Design & configuration
Architecture, data flows, interfaces, access model and audit trail design. Security and data integrity decided here rather than assessed later, because retrofitting either into a qualified system is the expensive path.
Phase 05
Build & testing
Risk-based testing with a rationale that survives challenge: supplier evidence leveraged where it is credible, effort concentrated on what is configured, custom or critical. IQ, OQ, PQ sized to the risk.
Phase 06
Release & go-live
Data migration and its verification, training, cutover, and a release decision somebody can defend. Migration is frequently underestimated, and is often the first area an inspector examines.
Phase 07
Operation
Where a system spends most of its life: change control, patching, audit trail review, access recertification, backup and restore testing, periodic review. Validation is a state to be maintained, not an event that happened.
Phase 08
Retirement
The phase most often left undefined. Records must remain readable and retrievable for their full retention period after the system that produced them is gone — which is a decision about format and migration, taken years before anyone needs the data.